2V0-621D Practice, VMware VCP6-DCV Practice, 2V0-621D VMware Certified Professional 6 ˇ§C Data Center Virtualization Delta Beta Practice Cisco CCDP 300-101, 300-101 Implementing Cisco IP Routing (ROUTE v2.0) Exam 648-232 PDF, APE 648-232 Cisco WebEx Solutions Design and Implementation PDF CompTIA Network+ N10-006, CompTIA CompTIA Network+ Dumps PMI PMP, PMP PMP Project Management Professional, PMI PMP Answer 100-105 Answer, Cisco ICND1 Answer, 100-105 Cisco Interconnecting Cisco Networking Devices Part 1 (ICND1 v3.0) Answer 101 Dumps, F5 Certification 101 Application Delivery Fundamentals Dumps CCNA Collaboration 210-060, Cisco Implementing Cisco Collaboration Devices (CICD) Practice 300-207, CCNP Security 300-207 PDF, Implementing Cisco Threat Control Solutions PDF Cisco CCDP 300-320, 300-320 Designing Cisco Network Service Architectures Dump 2V0-621D Practice, VMware VCP6-DCV Practice, 2V0-621D VMware Certified Professional 6 ˇ§C Data Center Virtualization Delta Beta Practice Cisco CCDP 300-101, 300-101 Implementing Cisco IP Routing (ROUTE v2.0) Exam 648-232 PDF, APE 648-232 Cisco WebEx Solutions Design and Implementation PDF CompTIA Network+ N10-006, CompTIA CompTIA Network+ Dumps PMI PMP, PMP PMP Project Management Professional, PMI PMP Answer Microsoft 070-346, Microsoft Office 365 070-346 Managing Office 365 Identities and Requirements, Microsoft 070-346 Practice CCNA 200-125, Cisco CCNA Cisco Certified Network Associate CCNA (v3.0) Dump Cisco CCNP Collaboration 300-070, 300-070 Implementing Cisco IP Telephony & Video, Part 1(CIPTV1) Answer 70-534, Microsoft Specialist: Microsoft Azure 70-534 Exam, Architecting Microsoft Azure Solutions Exam 810-403 Questions, Cisco Business Value Specialist 810-403 Selling Business Outcomes Questions 100-105 Answer, Cisco ICND1 Answer, 100-105 Cisco Interconnecting Cisco Networking Devices Part 1 (ICND1 v3.0) Answer 101 Dumps, F5 Certification 101 Application Delivery Fundamentals Dumps CCNA Collaboration 210-060, Cisco Implementing Cisco Collaboration Devices (CICD) Practice 300-207, CCNP Security 300-207 PDF, Implementing Cisco Threat Control Solutions PDF Cisco CCDP 300-320, 300-320 Designing Cisco Network Service Architectures Dump CCNA Wireless 200-355, Cisco Implementing Cisco Wireless Network Fundamentals Exam 300-075, CCNP Collaboration 300-075 Exam Dump, Implementing Cisco IP Telephony & Video, Part 2(CIPTV2) Exam Dump 300-115 Questions, Cisco CCDP Questions, 300-115 Implementing Cisco IP Switched Networks (SWITCH v2.0)Questions Cisco 300-206, CCNP Security 300-206 Implementing Cisco Edge Network Security Solutions, Cisco 300-206 Dump ISC ISC Certification CISSP, CISSP Certified Information Systems Security Professional PDF 1Z0-062 Exam, Oracle Database 1Z0-062 Oracle Database 12c: Installation and Administration Exam Cisco 200-310, CCDA 200-310 Designing for Cisco Internetwork Solutions, Cisco 200-310 PDF 210-260 Dump, Cisco CCNA Security Dump, 210-260 Implementing Cisco Network Security Dump 640-916, CCNA Data Center 640-916 Answer, Introducing Cisco Data Center Technologies Answer Microsoft Office 365 70-346, Microsoft Managing Office 365 Identities and Requirements Questions 1Z0-062 Exam, Oracle Database 1Z0-062 Oracle Database 12c: Installation and Administration Exam Cisco 200-310, CCDA 200-310 Designing for Cisco Internetwork Solutions, Cisco 200-310 PDF 210-260 Dump, Cisco CCNA Security Dump, 210-260 Implementing Cisco Network Security Dump 640-916, CCNA Data Center 640-916 Answer, Introducing Cisco Data Center Technologies Answer Microsoft Office 365 70-346, Microsoft Managing Office 365 Identities and Requirements Questions Microsoft 070-346, Microsoft Office 365 070-346 Managing Office 365 Identities and Requirements, Microsoft 070-346 Practice CCNA 200-125, Cisco CCNA Cisco Certified Network Associate CCNA (v3.0) Dump Cisco CCNP Collaboration 300-070, 300-070 Implementing Cisco IP Telephony & Video, Part 1(CIPTV1) Answer 70-534, Microsoft Specialist: Microsoft Azure 70-534 Exam, Architecting Microsoft Azure Solutions Exam 810-403 Questions, Cisco Business Value Specialist 810-403 Selling Business Outcomes Questions CCNA Wireless 200-355, Cisco Implementing Cisco Wireless Network Fundamentals Exam 300-075, CCNP Collaboration 300-075 Exam Dump, Implementing Cisco IP Telephony & Video, Part 2(CIPTV2) Exam Dump 300-115 Questions, Cisco CCDP Questions, 300-115 Implementing Cisco IP Switched Networks (SWITCH v2.0)Questions Cisco 300-206, CCNP Security 300-206 Implementing Cisco Edge Network Security Solutions, Cisco 300-206 Dump ISC ISC Certification CISSP, CISSP Certified Information Systems Security Professional PDF 642-996, 70-243, 70-462, 70-697, 9L0-012, 642-997, 70-331, 70-463, 70-980, 9L0-066, 642-889, 700-801, 70-417, 70-410 exam, 9A0-385, 642-732, 700-505, 70-413, 70-533, 98-366, 642-998, 70-332, 70-466, 70-981, 300-101 practice, 400-101 dumps, 70-345, 70-483, Cisco 200-105, 100-105, 640-911, 700-038, 70-410, 70-489, 840-425, 640-692, 648-232, 70-346, 70-486, 74-678, 640-875, 700-001, 70-347, 70-487, 77-420, 642-980, 700-803, 70-461, 70-680, 9A0-388, 640-878, 700-037, 70-384, 70-488, 810-403, 642-999, 70-333, 70-480, 712-50, ACCP-V6.2, 642-747, 700-702, 70-414, 70-534, 98-379, 642-035, 700-501, 70-412, 70-532, 98-365, 640-916, 700-260, 70-411, 70-494, 98-361,

UPDATE: 6L90E: No Line Rise after a Rebuild – Gears Magazine
Keep Those Trannys Rolling - May - 2016

UPDATE: 6L90E: No Line Rise after a Rebuild

In this issue, we’re going to look at a 2007 GMC K2500 equipped with a 6L90E that had no line rise after being rebuilt. But first we’re going to take a brief look at what makes the 6L80/90E transmission tick.

Getting to Know the 6L80/90E

The General Motors 6L80E and 6L90E 6-speed transmissions were introduced in the late 2005 General Motors truck line as a successor to the 4L60E and 4L80E. It features clutch-to-clutch shifting.

The 6L80/90E transmission consists of five clutch sets (1234, 35R, 456, 26 and LR), a planetary set, and a low clutch sprag, which provides six forward gears and reverse.

The hydraulic system primarily consists of a vane-type pump, two control valve bodies, a converter housing, and a case.

The transmission is controlled by its internal transmission control module (TCM). The TCM commands shift solenoids and variable bleed solenoids (located on the valve body) to control shift timing and feel. The TCM also controls apply and release of the torque converter clutch, which provides maximum fuel efficiency without sacrificing performance.

Hydraulic system — The 6L80/90E transmission hydraulic system consists of a vane type pump, which provides system pressure; two control valve bodies, which control application and release of the individual clutches; the torque converter housing, which houses the pump assembly; and the case assembly.

Transmission Control — The 6L80/90E transmission is controlled by its internal TCM.
The TCM receives signals from throughout the vehicle. From those signals, the TCM controls the operation of the shift solenoids and variable bleed solenoids to provide the best possible shift timing and feel.

Problems in other onboard computer systems can interfere with transmission operation. Remember to correct all existing codes in other modules before attempting to diagnose a transmission problem.

Pressure Controls — The 6l80/90E transmission hydraulic system uses a vane type pump to supply line and boost pressure to operate the transmission. The pump assembly consists of the pump cover, the rotor and vanes, a slide, and the torque converter housing.

The pump cover houses the rotor and vanes, the pump slide, the pressure regulator and isolator valves, the TCC control valve, and the converter feed limit valve (figure 1). The pump cover also includes a pressure relief valve and spring to prevent over-pressurizing the hydraulic system.

The TCM controls line and boost pressure by modulating voltage to the pressure control solenoid (PCS). The PCS applies pressure to the isolator valve, which, in turn, forces the pressure regulator valve to increase line or boost pressure in response to vehicle load (figure 2).

No Line Rise

Now that we’ve looked at how the 6L80/90E transmission operates, it’s time to tackle our problem vehicle that had no line rise after a rebuild. The technician working on the vehicle said he rebuilt the transmission about a month ago; it came back within a couple of weeks with the fluid burnt.

He connected a pressure gauge: line pressure was steady at about 65-70 PSI but there was no line rise during acceleration. The technician disconnected the transmission electrical connector to try to force maximum line rise; it wouldn’t rise above 70 PSI, indicating an internal problem.

Remove, Inspect, Repair

The technician removed the transmission and tore it down. With the transmission on the bench, he removed the valve body assembly and air checked the clutch components at low pressure. All the clutches air checked good with 35 PSI.

During disassembly, the technician found the 1234, 35R, and 456 clutch packs were burnt. He went over his parts list from the previous rebuild and found that the torque converter housing had been replaced due to debris damage, and the 1234 clutch piston and 35R clutch drum assembly were also replaced.

Since the clutch circuits were capable of holding pressure, the technician knew that this problem was something he’d built into the unit.

Parts Interchange Problem

The technician knew that the only major component he’d replaced was the torque converter housing. He disassembled the pump for inspection. He checked the isolator valve, pressure regulator valve (located in the pump cover), and their bores for wear. The pump cover looked okay.

Then he inspected the torque converter housing and found that the new, OEM torque converter housing’s hydraulic passages near the pressure regulator valve (figure 3) were different than the original housing’s (figure 4). Which begged the question, is the lack of line rise a parts interchange problem?

I had the technician take pictures of the original and the new OEM torque converter housings’ hydraulic passages and send them to ATRA for review. From the pictures it was obvious there was something different about the new housing.

With pictures in hand, I contacted our local GM dealership parts department to discuss the situation. According to our local parts guy, the torque converter housing and pump body assembly had just been updated to a new design and weren’t interchangeable individually (news of this update is just getting out). Replacing the torque converter housing would require replacing the pump body assembly with the new design.

Boost Problem Resolved

I contacted the technician and explained that the torque converter housing and pump body were updated and would have to be replaced as a set. The technician replaced the pump body assembly with the new, updated version and reassembled the transmission.

He installed the transmission and checked the line and boost pressures. Both were now within specification; the line pressure was rising and falling with throttle position. With the line pressure responding properly, it was time for a test drive.

During the test drive, transmission worked great. The technician left the pressure gauge connected to the transmission so he could monitor line pressure and rise.
They worked perfectly. With the line rise problem resolved, it was time to deliver the vehicle.

Well, there you have it: a brief look at one of the many problems associated with replacing component parts. That’s why it’s so important to compare the replacement parts with the originals, to make sure they’re the same as the part you’re replacing.

If they aren’t identical, question it: Make sure you’re using the correct replacement parts. With a little better understanding of parts interchange, you should have no problem keeping those trannys rolling!